Chandrayaan Live: one page for India’s journey to the Moon
This is Exceptional Technology’s live tracker for India’s Chandrayaan programme. Instead of a new article for every announcement, this page grows with the programme itself: each confirmed milestone gets a new dated entry at the top, so you can follow the whole story in one place.
We update this page only on confirmed, official milestones from ISRO and the Government of India – a launch, a landing, a test, a science result, or a formal programme announcement. No rumour, no speculation, and no firm launch date until ISRO announces one.
How to read it: start at the top for the latest update, then scroll down for the story so far. When the programme reaches its next major phase, the live page will be archived as a complete timeline and a new phase tracker will take over.
Latest update — Chandrayaan-4: the sample-return mission is next
28 October 2026 — Tracker opened. Chandrayaan-4, India’s approved lunar sample-return mission, is the next major chapter. It is designed to go further than landing: land on the Moon, collect lunar material, lift off from the lunar surface, dock in lunar orbit, and bring the samples back to Earth for study in Indian laboratories.
That makes it India’s most complex lunar mission yet, building directly on Chandrayaan-3’s soft-landing technology and Chandrayaan-2’s orbiter heritage. The architecture uses multiple modules and two LVM3 launches. ISRO has not fixed a public launch date to the day, and reporting varies on the target year – so this tracker will not publish a firm date until ISRO confirms it. What is certain is the direction: India is moving from reaching the Moon, to landing on it, to bringing a piece of it home.
What to watch next: hardware and docking tests for Chandrayaan-4, formal ISRO updates on the mission timeline, and progress on the follow-on lunar polar mission with Japan’s JAXA, known as LUPEX / Chandrayaan-5, which will explore the Moon’s permanently shadowed polar regions for water ice.
The story so far
23 August 2023 — Chandrayaan-3 lands near the lunar south pole
Chandrayaan-3, launched on 14 July 2023 from Sriharikota, made a successful soft landing near the Moon’s south pole. India became the first country to land near the lunar south pole, and the fourth country to achieve a soft landing on the Moon. The Vikram lander deployed the Pragyan rover, which carried out surface science on the Moon. 23 August is now celebrated as National Space Day in India.
22 July 2019 — Chandrayaan-2: orbiter success, lessons carried forward
Chandrayaan-2 launched with an orbiter, the Vikram lander and the Pragyan rover. The orbiter reached lunar orbit and has continued to return valuable data. Contact with the lander was lost during its final descent, about 2.1 km above the surface. The orbiter’s data and the lessons from that descent shaped Chandrayaan-3’s successful landing four years later.
22 October 2008 — Chandrayaan-1: India’s first step to the Moon
Chandrayaan-1, India’s first lunar probe, orbited the Moon and played a pivotal role in confirming water molecules on the lunar surface – a discovery that reshaped lunar science worldwide and set the foundation for everything that followed.
Why this programme matters
Chandrayaan is not a single mission. It is a programme that has grown step by step: orbit, then land, then rove, and now return samples. Each step has built Indian capability in launch, navigation, landing, surface operations and, next, docking and re-entry. The science matters too – from water on the Moon to the geology of the south pole – and it is all done with India’s own launch vehicles and spacecraft, built by ISRO and a growing Indian space industry.
Sources: ISRO and Government of India announcements on the Chandrayaan programme. This tracker will be updated only when a new official milestone is confirmed.







